18-2025-00000056
Increase greenhouse gas removal
Protective plantings were created on the territory of the Volgograd TPP-3 branch of KAUSTIK JSC

The number of carbon units released within the framework of the climate project

0
08.04.2022beginning of the offset period
08.04.2036end of the offset period
2 041
Planned
amount of reduction
2 041
CU planned for release
0
CU in circulation within the CP
0
CU offsetted

General information

Executor
KAUSTIK JSC, OGRN 1023404355666 dated 29.07.2002
State
Active
Executor location address
400097, OBLAST' VOLGOGRADSKAYA, G. VOLGOGRAD, UL. 40 LET VLKSM, D.57
Industry affiliation of the climate project (in accordance with OKVED)
02.10
Current status of the climate project (information on the climate project implementation)
To date, within the framework of the climate project "Creation of protective plantings on the territory of the Volgograd CHPP", the key stages ensuring the successful achievement of the project objectives have been fully completed. Poplar seedlings with a closed root system were planted on a total area of 5.19 hectares in three stages: in the spring of 2022, 2023 and 2024. Measures for planting and caring for seedlings, including soil preparation, planting of seedlings and the use of agrotechnical techniques such as drip irrigation, have made it possible to achieve a high survival rate of plants (83% for 2024). Scientific research works aimed at studying the depositing ability of poplar hybrids in the conditions of the Volgograd region have been carried out. Tests have shown the high efficiency of plants in absorbing carbon dioxide. Justifications for the selection of breeds for further use in afforestation have been prepared and presented. A project monitoring plan has been developed, including regular assessment of carbon stocks in biomass, litter, soil and dead wood, as well as the first measurements and calculations. The forecast results show that the implementation of measures already at this tap ensures a steady increase in carbon uptake in the project area. The project has been tested for compliance with legislative requirements and has been adapted in accordance with methodology No. 0025 "Afforestation and Phytorecultivation". The documentation is fully documented in accordance with current standards. All planning, boarding, and initial monitoring activities have been completed.

Climate project deadlines

Climate project implementation period
08.04.2022-08.04.2036
Actual climate project start date
08.04.2022
Scoring period
08.04.2022 - 08.04.2036

Validation information

Report on the compliance of the project with the criteria for project classification
St. Petersburg Scientific Research Institute of Forestry, OGRN 1027801532252, unique accreditation record number in the Register of Accredited Persons, OGRN 1027801532252, unique accreditation record number in the register of accredited persons RA.RU.150014 dated 2025-02-12
Number and date of report
1-02 dated 2025-02-12
Number and date of the validation report
1-02 dated 2025-02-12

Location addresses